01 02 03 04 05 06 07

08 09 10 11 12 13 14

15 16 17 18 19 20 21

installing the deck 11

Here I am hammering in nails one at a time, from side to side, to the bow from the cockpit, using ratchet strap clamps to hold everything down. This is long job taking nine hours of non-stop hammer action.